Track 8 · Control and performance
Flexible budgets
Flex a budget to the actual level of activity so volume effects are separated from price and spending performance.
You will be able to
- Explain why comparing actual results with a static budget misleads when volume changes.
- Prepare a flexible budget by flexing variable costs and holding fixed costs constant.
- Split the total variance into a sales volume variance and flexible-budget (price and spending) variances.
Builds on
A static budget is prepared for one planned level of activity. Kestrel Cycles budgeted to build and sell 1,000 bikes; it actually sold 1,100. Comparing actual costs with the static budget says costs are "over budget" — but of course they are: Kestrel built 10% more bikes. That comparison mixes two different questions:
- Did we sell more or fewer units than planned? — a volume question.
- Given what we actually sold, did we earn the right price and spend the right amount? — a price and efficiency question.
A flexible budget answers the second question by restating the budget at the actual volume, using the budgeted cost behaviour: - Variable costs flex: budgeted cost per unit × actual units. - Fixed costs don't flex: they stay at the budgeted amount, because they shouldn't change with volume within the relevant range. - Semi-variable costs flex only their variable part: fixed element + variable rate × actual units.
The sales volume variance (flexed profit − static profit) captures the effect of volume, valued at budgeted contribution per unit. The flexible-budget variances (actual − flexed, line by line) capture price and spending. Together they explain the whole difference between static budget profit and actual profit.
Sign convention used here: favourable variances are positive, adverse are negative. Revenue above the flexed budget is favourable; a cost above the flexed budget is adverse.
Included with a Formula Quest membership
A membership includes the worked examples, all 6 graded exercises and the full curriculum. The foundations track, the first ledger lessons and the Northstar Trading case stay free.
Content review: answers and figures are checked by automated tests against the accounting engine, and the text has had an internal review against the standards; independent review by a qualified accountant is pending.